The FDOT has begun a resurfacing project on SR 559 from Interstate 4 to SR 33. The project includes:

  • Milling and resurfacing the roadway 
  • Asphalt driveway reconstruction 
  • Shoulder widening
  • Turn lane reconstruction
  • Widening for keyhole bike lanes at the turn lanes
  • New traffic signals with supplemental lighting at the SR 559 and I-4 ramps 

Crews will work on signals for the week of November 23 to November 30. Watch for shoulder closures on the bridge above I-4. Use caution and be prepared to merge or stop.

The post FDOT Begins Resurfacing Project on SR 559 in Auburndale first appeared on Winter Haven Daily.